Dispatch – October 30: Rehabilitation

It’s after 10 pm, and about a hundred meters from the parliament building, in a place once covered with asphalt, there is a large, deep, dark hole. Inside the hole lies a massive concrete box, the outer frame of the underground passage, and over that large box runs a pipe, a newly installed one, but …Источник:

Leave a Reply

Your email address will not be published. Required fields are marked *